fbpx

Article

Isao Kato Interview on Shigeo Shingo's Influence on TPS

Isao Kato believed that people development cannot be separated from production system development. During his career at Toyota he developed training materials under the direction…

View article
Article graphic image with repeating icons

Event

Lean Warehousing and Distribution Operations

Improve a distribution center's efficiency, quality, safety, and space utilization.

View event

Gainesville, Florida

Download

553.pdf

Download

Lexicon Term

Andon

Andon is a visual management tool that highlights the status of operations in an area at a single glance and that signals whenever an abnormality…

Learn more

Lexicon Term

Inventory Turns

A measure of how quickly materials are moving through a facility or through an entire value stream, calculated by dividing some measure of cost of…

Learn more

Lexicon Term

Operation Availabilty versus Operating Rate

Operational availability is the fraction of time a machine functions properly when needed. (Also called operable rate.) The operating rate is the amount of time…

Learn more